Home / Partners / Site model

For owners of gas, landfills and industrial land

See what your energy could build

Pick your energy source and gas flow. The live model sizes the power plant and AI compute modules that could sit on your site, powered by on-site gas engines with no grid connection.

0
MW on site
0
AI racks
$0
To you, per year
Live model
Size it to your site

Set your gas, see what could be built

Move the sliders to match your site. The model and the numbers update together. These are planning estimates from rules of thumb; real figures come from your gas data and site studies.

Energy source
Standard cubic feet per minute, as reported to your regulator.
Examples
Paid to you each year
$0
gas purchase plus land lease, at typical prices
Over a 10-year term
$0
Power on site
0MW
from your gas, firm
Generator sets
0
running plus one spare
Computing load
0MW
after cooling and losses
AI racks
0
liquid-cooled, about 120 kW each
GPUs
0
at 72 per rack
Compute modules
0
about 1 MW each, 8 racks
Land used
0acres
including gas yard and setbacks
Gas used
0k MMBtu/yr
at 95% running time
Grid connection
None
no export, no new load on the grid

Planning estimates only, not an offer. Prices and terms are set site by site in signed agreements.

How the site works

From your gas to computing, all inside one fence

Behind the numbers

How the model sizes a site

Rules of thumb, so you can check the arithmetic. Real figures come from your gas analysis and our site studies.

Show the assumptions
ItemValueBasis
Methane energy content1,012 Btu/scfHigher heating value of methane
Pipeline gas energy content1,037 MMBtu/MMcfTypical pipeline-quality gas
Engine heat rate, landfill gas11,000 Btu/kWhWithin the 10,600-11,700 range used by the US EPA landfill methane program
Engine heat rate, field gas9,000 Btu/kWhModern lean-burn gas engines
Running time95%Planned and unplanned maintenance
Generator set size1.6 MW / 2.5 MWLandfill / field gas; one spare unit
Cooling and losses (PUE)1.20Liquid cooling with dry coolers
AI rack power120 kWCurrent liquid-cooled 72-GPU racks
Compute moduleAbout 1 MW of computing (8 racks)Factory-built, container-sized
Land5 acres + 1.2 acres per MWGas yard, engines, modules, roads and setbacks; varies by site
Payment rangeGas used × a typical price band, plus acres × $1,000-2,000 a yearTypical bands only; your price is agreed in the gas agreement. Before any royalties or taxes you owe.

Start with your numbers

Send us your gas flow and a site plan

We reply by email with a first sizing for your site, based on your own data.